Demand Square

Post project requirements and connect with over 1,000+ quality suppliers worldwide

+ Post Your Requirement

Factory Design Services

2026-04-22 17:13:09

0

0

0

Providing factory design services

Basic chemical raw material manufacturing

Fine Chemical Manufacturing

New Materials and Polymer Materials

Fertilizers and Agrochemicals

Petrochemical and Coal Chemical Industries

Chlor-alkali and Salt Chemical Industry

Pharmaceuticals and Chemical Intermediates

Engineering Design and Engineering Consulting

United Arab Emirates

Oman

Pakistan

Southeast Asia

Russia

Africa

Kazakhstan

C - Construction

Remaining388Days

Arc'teryx Chemical Co., Ltd.

2026-04-21 11:10:09

0

0

0

Engineering Design, EPC Turnkey!

Petrochemical and Coal Chemical Industries

Pharmaceuticals and Chemical Intermediates

Utilities

China

E - Engineering Design

Remaining114Days

New Zealand Marsden Point Biorefinery (Northland Region)

2026-04-20 21:55:30

0

0

0

- Investor: Seadra Energy Alliance (including Air New Zealand, Renova, Kent, ANZ)
- Location: Marsden Point (former refinery site)
- Scale: Investment of approximately NZD 300 million
- Products: Sustainable Aviation Fuel (SAF), Biodiesel, Bio-based Chemicals
- Progress: Development agreement signed in October 2024; construction to commence in 2026-2027
- Highlights: Utilizes waste oils and agricultural/forestry residues as feedstock; New Zealand's first large-scale aviation biofuel project

Petrochemical and Coal Chemical Industries

New Zealand

E - Engineering Design

P - Procurement

Remaining1Days

New Zealand Marsden Point Biorefinery (Northland)

2026-04-20 21:54:09

0

0

0

- Investors: Seadra Energy Alliance (including Qantas, Renova, Kent, ANZ)
- Location: Marsden Point (former refinery site)
- Scale: Investment of approximately NZD 300 million
- Products: Sustainable Aviation Fuel (SAF), Biodiesel, Bio-based Chemicals
- Progress: Development agreement signed in October 2024; construction to commence in 2026-2027
- Highlights: Utilizes waste oils and agricultural/forestry residues as feedstock; New Zealand's first large-scale aviation biofuel project

Petrochemical and Coal Chemical Industries

New Zealand

E - Engineering Design

P - Procurement

Remaining1Days

Instrument Procurement

2026-04-17 13:35:59

0

0

0

test: Establish a new oil refinery and procure instruments and automation systems according to the design drawings.

Petrochemical and Coal Chemical Industries

Vietnam

P - Procurement

Remaining1Days

Wet-process phosphate acid with capacity of 700,000t/y----Urgent!

2026-04-09 20:24:37

9

0

0

TURN-KEY project for PA . need to break ground on Dec, 2027

EPC General Contracting and Project Management

United Arab Emirates

T - Technology & Patents

E - Engineering Design

P - Procurement

Remaining543Days

Patent for Chemical Pollution-Free Scale Inhibitor

2026-04-17 13:36:56

0

0

0

Test: After adding the scale inhibitor, the circulating water quality remains uncontaminated and can be used for other purposes.

Environmental Protection and Comprehensive Resource Utilization

Utilities

Egypt

T - Technology & Patents

Closed

Small-scale production needs for daily chemical raw materials

2026-04-13 15:16:52

6

0

0

A small-scale production validation for powdered cosmetic raw materials is required, with a capacity specification ranging from several kilograms to tens of kilograms per batch. Core requirements:  
Equipment configuration: Must possess a complete production line for freeze drying and solid powder mixing;  
Production conditions: Must have a cleanroom compliant with cosmetic production standards (GMP) and independent production capabilities;  
Raw material scope: Feedstock components are primarily peptide-based, while also including other commonly used cosmetic-grade raw materials, and all raw materials have been included in the "Inventory of Used Cosmetic Raw Materials."  
We sincerely invite enterprises with capabilities in OEM/production technology for cosmetic powder raw materials to connect and collaborate.

Chemical Engineering Technology Research and Development and Process Package

Pakistan

T - Technology & Patents

Closed

Pilot-scale Production of Food Additives

2026-04-13 14:46:31

0

0

0

We currently have a laboratory-scale process plan for a food additive, which requires process scale-up, pilot-scale verification and optimization. The ultimate goal is to deliver key industrial production parameters such as the optimal material ratio, reaction temperature, reaction time, etc., and to provide equipment selection recommendations for industrial-scale production. We sincerely invite organizations with relevant pilot-scale amplification capabilities to discuss potential collaboration.

Chemical Engineering Technology Research and Development and Process Package

China

T - Technology & Patents

Closed

Requirements for Powder High-Temperature Sintering

2026-04-13 14:13:57

0

0

0

Project Requirements: High-temperature calcination of powdered raw materials with a total weight of 200kg. The process conditions involve constant-temperature calcination at 840°C for 2 hours. The sintering process can be completed in batches, ultimately producing calcined coal gangue as the final product. Companies with relevant calcination equipment and technical capabilities are welcome to contact for cooperation.

Petrochemical and Coal Chemical Industries

China

T - Technology & Patents

Closed
With 1,000+ quality service providers, we help you quickly find the right professional team to efficiently solve your chemical project challenges.
+ Post Requirement Now
Over 1,200 requirements have been successfully matched on this platform.
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
FAQ关闭
How can buyers check the progress of project coordination?
After signing in, you can click on the avatar in the upper right corner of the webpage to view the progress and status updates of all connected projects on the "My Account - Project History" page, and communicate with platform customer service at any time regarding project connection matters.
Can the posted project requirement information be modified later?
You can modify the deadline for posted project requirements. This operation can be performed on the "My Account - Project History - My Posts - Service Demand" page. If your requirements have changed, it is recommended to update the information in a timely manner to ensure that suppliers can stay informed of the latest situation.
How to filter suppliers that meet your requirements? How should filter tags be combined to achieve precise matching?
You can use the platform's filtering function to find suppliers that meet your needs. On the "Demand and Supply - Supply Square" page, you can filter by tags such as service type, industry, country/region, and response time. For more precise matching, it is recommended to combine multiple filtering conditions. Start by using primary conditions (such as service type and industry) to narrow down the scope, then use secondary conditions (such as country/region and response time) to further pinpoint your search.
How can buyers post project requirements? What core information needs to be specified?
Purchasers can post project requirements through the following steps: After signing in the platform, click on "Demand and Supply," enter the "Demand Square," click the "Post Your Requirement" button, and fill in the requirement details as prompted on the page. Information to be filled out includes: service type, industry, country/region, project stage, specific requirements, contact information, etc. The more detailed the requirement information provided, the easier it is to attract suitable suppliers.
What is the project onboarding process?
Project Matching Process:
1. Post project requirements / supply capabilities – Share your project needs or what you can offer.
2. Intelligent matching & recommendations – The system automatically matches and suggests potential partners.
3. Initial communication – Get in touch to exchange basic information.
4. Confirm cooperation intent – Both parties agree in principle to move forward.
5. Detailed offline negotiation – Discuss specifics in person or in a formal meeting.
Need more help? Click the chatbot, Silky, on the right side.
How to add to desktop关闭
关闭