Demand Square

Post project requirements and connect with over 1,000+ quality suppliers worldwide

+ Post Your Requirement

India's demand for 1 million tons/year of sulfuric acid project

2026-08-19 16:20:54

0

0

0

An Indian large-scale phosphorus chemical enterprise is planning to build a 1 million ton/year sulfuric acid production unit to provide raw materials for the downstream phosphorus chemical industry chain. The project is of large scale and is planned to use the sulfuric acid production process. The owner is concerned with the conversion and absorption efficiency, the level of waste heat recovery utilization, and the ability of the unit to operate stably over a long period. Design institutes with experience in designing large-scale sulfuric acid units are welcome to interface and provide process solutions, basic design, and heat energy integrated utilization solutions. Suppliers of key equipment such as sulfurization furnaces, converters, and dry absorption towers, as well as catalysts, are also welcome to participate in exchanges and explore subcontracting cooperation.

Basic chemical raw material manufacturing

Fertilizers and Agrochemicals

India

E - Engineering Design

P - Procurement

Open Indefinitely

India 1.6 million tons/year fluorinated aluminum project engineering requirements

2026-08-19 16:20:40

0

0

0

A large-scale fluorine-aluminum project with an annual production capacity of 1.6 million tons has been signed and is under implementation. Fluorine-aluminum is an important additive in the electrolytic aluminum industry. The project has a capacity of 1.6 million tons per year, and the preliminary input data and basic engineering design data have been delivered. Design work is progressing as planned. The project is currently under implementation, and the supporting requirements continue to be released. The detailed design, equipment procurement, technical support, and on-site services required in the subsequent stages will gradually become clear. Design institutes, engineering companies, and equipment suppliers with expertise in fluorine chemical process technology, experience in the design of fluorine-aluminum or similar inorganic fluorine compounds, and experience in implementing projects in India and overseas are welcome to pay attention to and engage in supporting cooperation in the subsequent stages of the project.

Basic chemical raw material manufacturing

Engineering Design and Engineering Consulting

India

E - Engineering Design

Open Indefinitely

800,000 tons/year flue gas carbon dioxide capture project in India

2026-08-19 16:20:25

0

0

0

An Indian enterprise is planning a 80,000-tonne/year carbon dioxide capture project to capture and recover carbon dioxide from industrial flue gas. The plant will have a capacity of 80,000 tonnes/year, and the captured product can be used in food and beverage, welding protection, and chemical raw materials. The project has high requirements for the energy consumption level of the capture process, the performance of the absorbent, and the long-term operation capability of the plant. The project has been temporarily suspended, and it may be restarted when conditions are mature. The owner is still interested in advanced and applicable carbon capture technologies. Technology holders, design institutes, and engineering companies with mature carbon capture technologies and engineering experience in similar plants are welcome to maintain contact and cooperate when the project is restarted.

Environmental Protection and Comprehensive Resource Utilization

India

T - Technology & Patents

E - Engineering Design

Open Indefinitely

India 660,000 tons/year demand for soda ash

2026-08-19 16:20:12

0

0

0

An Indian enterprise had planned a 660,000-tonne per annum soda ash project, intending to use soda ash as raw material and adopt the carbonization process to produce soda ash products. The plant was planned to have a capacity of 660,000 tonnes per annum, with products targeting the Indian domestic food additives, pharmaceuticals and chemical markets. The project has been terminated, but the demand for soda ash and related salt chemical products in the Indian market continues to grow, and the demand for similar projects can be sustained. Design institutes, process package providers and engineering companies with mature process technology for the deep processing of soda ash and soda ash, as well as experience in Indian projects, are welcome to maintain their attention. If there is information on similar projects, they will be prioritized for matching.

Basic chemical raw material manufacturing

Chlor-alkali and Salt Chemical Industry

India

E - Engineering Design

Open Indefinitely

Design Consultancy Services for the 300,000-ton sodium carbonate project in Indonesia

2026-08-19 16:19:58

0

0

0

The 300,000 tons per year soda ash project in Indonesia has entered the construction preparation stage, and the owner is seeking a design institute to provide detailed design consulting services. The scope of requirements will be selected by the owner from the list of services provided by the Chinese side and then quoted for business. The project adopts a mature soda ash plant technology, and the owner is concerned about the design consultant's support capabilities for construction drawing quality, equipment procurement technology, and on-site problem handling. Design institutes with detailed design experience in large soda ash plants and capable of providing overseas design consulting services are welcome to interface and respond flexibly according to the scope of services. Related equipment supervision and technical services can also be provided.

Basic chemical raw material manufacturing

Engineering Design and Engineering Consulting

Indonesia

E - Engineering Design

C - Construction

Open Indefinitely

Design requirements for a 100,000-ton soda ash plant in Qatar

2026-08-19 16:19:45

0

0

0

The Qatari owner is planning to build a 100,000-tonne per annum soda ash project, relying on local resource conditions to lay out basic chemical production capacity. Currently, the owner is seeking technical solutions and quotations. The owner is concerned with the selection of process routes, the scale of equipment investment, energy consumption indicators, and the adaptability of the project in the high-temperature environment of the Middle East, and is inclined to cooperate with Chinese engineering forces with overseas performance. Chemical design institutes with experience in soda ash plant design are welcome to interface and provide process solutions, basic design, and investment estimates; engineering companies and key equipment suppliers with experience in Middle East projects are also welcome to participate in early-stage exchanges.

Basic chemical raw material manufacturing

Qatar

E - Engineering Design

Open Indefinitely

Liquefied and purified carbon dioxide project for a Hungarian chemical company

2026-08-19 16:19:31

0

0

0

A chemical company in Hungary had planned a design project for a carbon dioxide liquefaction purification unit, which would purify and liquefy the by-product or recycled carbon dioxide gas to produce industrial-grade or food-grade liquid carbon dioxide products. The unit involved compression, purification, liquefaction, and transportation units, and required high levels of control over the gas purification depth and product quality. The project has been terminated, but the demand for carbon dioxide recovery and utilization and food-grade carbon dioxide in Europe is stable, and opportunities for similar projects can be sustained. Design institutes, engineering companies, and technology holders with mature carbon dioxide purification and liquefaction technologies, similar design experience, and European project experience are welcome to maintain contact, and similar needs will be promptly forwarded.

Environmental Protection and Comprehensive Resource Utilization

Hungary

E - Engineering Design

Open Indefinitely

Russian high-purity hydrogen PSA custom purification system

2026-08-19 16:19:17

0

0

0

The Russian petrochemical industry is planning to build a custom purification system with a feed rate of approximately 283 tons per day and a hydrogen purity of 99.9%, using pressure swing adsorption (PSA) technology to meet the hydrogen quality requirements of downstream high-value devices. At present, the client has received the technical plan and is in the clarification and evaluation stage, focusing on adsorbent life, hydrogen recovery rate, automation level of the system, and long-term operation stability. Technical parties with performance in large-scale PSA hydrogen production and purification systems are welcome to interface, provide process packages, detailed designs, and adsorbent support services; at the same time, suppliers of key equipment such as control valves and adsorption towers are welcome to negotiate supply and joint bidding.

Petrochemical and Coal Chemical Industries

Chemical equipment manufacturing

Russia

E - Engineering Design

P - Procurement

Open Indefinitely

Russian borax and anhydrous borax development project

2026-08-19 16:18:58

0

0

0

The Russian large-scale petrochemical group has explored a project for the development of magnesium nitrate and anhydrous magnesium nitrate (elemental lime), intending to develop salt chemical products through the cooperation of the group's resources and industrial chain. Due to limitations in resources and supporting conditions, the project is currently in a suspended state, and may be restarted when conditions are ripe. The project involves the extraction, processing, dehydration conversion, and refining of magnesium nitrate. Design institutes with expertise in magnesium nitrate/elemental lime processes and engineering achievements are welcome to follow up and keep in touch, and can provide resource evaluation, process route selection, and equipment design reserves. Suppliers of evaporation crystallization, drying, and packaging equipment are also welcome to stay tuned and make technical and business preparations for a potential restart.

Basic chemical raw material manufacturing

Chlor-alkali and Salt Chemical Industry

Russia

E - Engineering Design

Open Indefinitely

Demand for carbon dioxide capture projects in Russian petrochemical enterprises

2026-08-19 16:18:44

0

0

0

A large-scale petrochemical group plans to implement a carbon dioxide capture project, capturing and utilizing the carbon dioxide emitted by petrochemical facilities, helping the company achieve its low-carbon emission reduction targets. The project has significant environmental benefits and demonstration value. The project requires the use of mature and efficient carbon capture technologies, including the selection of adsorbents, energy consumption optimization, plant integration, and subsequent utilization pathways. The owner is looking for partners with the corresponding technical strength. Technical holders, design institutes, and engineering companies with carbon capture technologies, large-scale carbon capture plant engineering experience, and low-temperature separation experience are welcome to come and exchange on technical routes and cooperation models.

Environmental Protection and Comprehensive Resource Utilization

Russia

T - Technology & Patents

E - Engineering Design

Open Indefinitely
SRC Posts

俄罗斯连续式热裂解装置固体残渣连续排出系统优化专家寻访

• Closed

67

0

本项目为俄罗斯某公司的试验级连续式热裂解装置技术优化需求。项目方目前希望引入具备连续式热裂解装置运行和/或设计经验的工程专家,对装置中固体炭渣/固体残渣连续排出系统运行不稳定的问题进行技术诊断,并提出结构改造及运行优化建议,目标是支持装置实现不少于 72 小时的连续稳定运行。 本次需求的核心问题集中在连续式热裂解过程中干态固体残渣的稳定排出。现有排出系统可能存在粘结、架桥、压实、堵塞、排出区域瓶颈、密封性或气密性不足等问题,需要专家结合设计文件、工艺文件、运行数据及固体残渣样品检测数据进行综合判断,识别导致排出系统不稳定的根本原因。 专家/顾问的主要工作内容包括:审阅试验级连续热裂解装置的设计文件与工艺文件;分析固体残渣样品及检测数据;评估固体残渣连续排出系统的结构、密封、输送及运行逻辑;提出排出单元或系统的结构改造建议;提出运行工况及操作参数优化建议;必要时赴俄罗斯叶卡捷琳堡现场进行设备审计,评估装置在实际运行状态下的技术状况。 最终希望形成书面工程分析报告,内容包括根因分析结论、推荐改造措施、运行工况优化建议、备选方案、可行性评估及初步实施周期。项目可根据实际需要进一步邀请专家支持改造后排出单元的安装、调试和连续运行验证,确认装置达到连续稳定运行不少于 72 小时的目标。 候选专家应具备连续式热裂解装置运行和/或设计相关实操经验,并具有干态固体残渣连续排出系统方面的成熟经验。专家应熟悉机械结构、材料、热工/热力学、粉体或固体输送、高温残渣处理、密封与气密结构、防粘结、防架桥、防压实等相关技术问题。能够通过视频会议高效沟通,并输出清晰的技术报告。 具备英语沟通能力、国际项目经验,或可赴俄罗斯叶卡捷琳堡现场支持 2–4 周者优先。如专业能力突出,英语能力可不作为强制要求。 参考目标专家来源包括但不限于:BESTON GRO

T - Technology & Patents

E - Engineering Design

S - Site & Revamp

H - Human Resources

Urgent Tasks

Russian Steam Turbine Maintenance Services

• Closed

0

0

Phase 1 includes procedures for complete disassembly inspection, gas generator support repair, compressor rotor/stator repair, combustion chamber repair, and turbine rotor repair. The work scope covers removing all pipelines from the complete machine and disassembling it down to individual parts, cleaning parts, dimensional tolerance inspection, non-destructive testing (NDT), and issuing a GTD defect list to confirm scrapping criteria with the customer; sequentially processing each stage of the gas generator supports, compressor stationary and rotating parts, combustion chamber, and turbine rotor, replacing damaged blades, seals, fuel injectors, thermocouples and other components, repairing coatings and sealing surfaces, and performing component runout control and dynamic balancing. Phase 2 carries out repair work on the turbine stator, power turbine rotor, and power turbine stator, repairing various sealing clearances, nozzles, blade coatings, replacing damaged components, correcting dynamic balance, and completing all turbine stationary and rotor component repairs. Phase 3 performs engine final assembly, mandatorily replacing all original bearings of the drive box; preparing overhaul execution documents and completion reports and communicating with the customer; completing equipment insulation, nameplate, wiring, and overall protective packaging, and transporting the gas turbine engine to the customer's plant using an air-suspension special vehicle. Phase 4 covers the on-site acceptance testing stage. Within 72 hours after the equipment arrives at the customer site, the complete-machine acceptance test run shall be conducted. The test plan is prepared by the contractor and confirmed by the customer; the repaired gas turbine replaces the original unit and undergoes a continuous 72-hour trial operation. The total duration of all procedures for complete machine replacement, repair, and testing shall not exceed 14 calendar days. After the test, a complete set of execution documents shall be submitted.

S - Site & Revamp

With 1,000+ quality service providers, we help you quickly find the right professional team to efficiently solve your chemical project challenges.
+ Post Requirement Now
Over 1,200 requirements have been successfully matched on this platform.
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
FAQ关闭
How can buyers check the progress of project coordination?
After signing in, you can click on the avatar in the upper right corner of the webpage to view the progress and status updates of all connected projects on the "My Account - Project History" page, and communicate with platform customer service at any time regarding project connection matters.
Can the posted project requirement information be modified later?
You can modify the deadline for posted project requirements. This operation can be performed on the "My Account - Project History - My Posts - Service Demand" page. If your requirements have changed, it is recommended to update the information in a timely manner to ensure that suppliers can stay informed of the latest situation.
How to filter suppliers that meet your requirements? How should filter tags be combined to achieve precise matching?
You can use the platform's filtering function to find suppliers that meet your needs. On the "Demand and Supply - Supply Square" page, you can filter by tags such as service type, industry, country/region, and response time. For more precise matching, it is recommended to combine multiple filtering conditions. Start by using primary conditions (such as service type and industry) to narrow down the scope, then use secondary conditions (such as country/region and response time) to further pinpoint your search.
How can buyers post project requirements? What core information needs to be specified?
Purchasers can post project requirements through the following steps: After signing in the platform, click on "Demand and Supply," enter the "Demand Square," click the "Post Your Requirement" button, and fill in the requirement details as prompted on the page. Information to be filled out includes: service type, industry, country/region, project stage, specific requirements, contact information, etc. The more detailed the requirement information provided, the easier it is to attract suitable suppliers.
What is the project onboarding process?
Project Matching Process:
1. Post project requirements / supply capabilities – Share your project needs or what you can offer.
2. Intelligent matching & recommendations – The system automatically matches and suggests potential partners.
3. Initial communication – Get in touch to exchange basic information.
4. Confirm cooperation intent – Both parties agree in principle to move forward.
5. Detailed offline negotiation – Discuss specifics in person or in a formal meeting.
Need more help? Click the chatbot, Silky, on the right side.
How to add to desktop关闭
关闭