Coal Chemical and C1 Chemistry Process Technology
  • 26-04-16 10:40
  • 95
  • 0personFavorited
  • 0personResponded

Inquire Now

Quick response, professional, and efficient — recommended for priority contact.

≤7 daysInterest
Capability Description
View Original

Accumulated multiple process technology routes in the fields of coal chemical and C1 chemistry. Representative projects completed include: 60,000 t/a and 120,000 t/a petroleum needle coke processing unit projects, 150,000 t/a coal tar hydrogenation unit optimization and revamping, 1.4 million t/a coal tar hydrogenation unit pretreatment process package development, 5,000 t/a dimethyl carbonate industrial demonstration project from indirect preparation of urea solution and methanol (including construction drawings + feasibility study + HAZOP), 100,000 t/a CO2 hydrogenation to methanol process package development, etc. The methanol-to-olefins (MTO) pilot plant project received the Ministry of Chemical Industry Award and Provincial Excellent Design Award. This field is suitable for countries and regions with abundant coal resources and interest in developing coal-based chemicals.

Inquire Now
More Recommendations

Key material technology for high-power, high-energy-density lithium batteries

0

0

For scenarios such as electric aviation, high-end equipment, and fast-charging power batteries, lithium-ion batteries are subject to stringent requirements for both high power and high energy density. The bottleneck is concentrated at the level of key materials. This technology focuses on high-power and high-energy-density lithium-ion batteries, developing key materials for the positive and negative electrodes, as well as supporting systems. The positive electrode is optimized for a balance between high specific capacity and structural stability, while the negative electrode is optimized for high capacity retention and lithium precipitation inhibition under fast-charging conditions. In addition, the technology combines electrolyte and electrode structure design to achieve synergy between materials, electrodes, and cells, supporting both high-rate charging and discharging and long-term durability. The technology can directly meet the product upgrade needs of cell manufacturers. At present, a pilot production facility has been built and validated, demonstrating the feasibility of material preparation and cell adaptation, and providing the basis for process scaling. The technology can provide services such as material preparation technology licensing, cell design adaptation support, pilot-scale production and production line construction guidance, performance evaluation, and personnel training.

T - Technology & Patents

Battery pulse electrochemical-mass spectrometry

0

0

This technology is aimed at developing a pulse electrochemical-mass spectrometry (EC-MS) combined analysis system for commercial batteries. It uses pulse electrochemical excitation to simulate dynamic loads under actual battery operating conditions, and combines high-sensitivity mass spectrometry to detect electrolyte gas generation and volatile intermediates in real time, achieving millisecond-level in-situ analysis. This provides direct experimental evidence for key issues such as electrolyte decomposition, gas generation failure, SEI evolution, and fast lithium extraction. The technology is suitable for research and development diagnosis, failure analysis, incoming material evaluation, and safety warning system construction in power batteries, consumer batteries, and energy storage batteries. A pilot installation has been completed and the feasibility and engineering suitability of the method have been verified. We can provide technical support for system installation, test method development, commissioned analysis services, and data interpretation training.

T - Technology & Patents

Coal Chemical and C1 Chemistry Process Technology
在煤化工和碳一化学领域积淀了多条工艺技术路线。已完成的代表性项目包括:6万吨/年和12万吨/年石油针状焦加工装置项目、15万吨/年煤焦油加氢装置优化改造、140万吨/年煤焦油加氢装置预处理工艺包编制、5万吨/年脲液与甲醇间接制备碳酸二甲酯工业示范项目(含施工图+可研+HAZOP)、10万吨/年CO2加氢制甲醇工艺包开发等。甲醇制低碳烯烃(MTO)中试装置项目曾获化学工业部奖和省级优秀设计奖。该领域适合煤炭资源丰富且有意发展煤基化学品的国家和地区。
Submit Inquiry
Name / Nickname*
Email*
Company(Optional)
Position(Optional)
Phone Number(Optional)
WeChat / WhatsApp Account(Optional)
Brief Description*
Inquiry submitted
Your inquiry has been submitted. Please keep your contact information accessible.
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
FAQ关闭
How do suppliers register on the platform?
After logging in, you can click the "Search" button, then click "All Service Types," scroll to the bottom of the page, and click the "Join Now" button to fill in your service provider's relevant information. The key details required include: service type, industry, country/region, company name, establishment date, company size, etc. The more detailed and professional the information you provide, the easier it is to attract the attention and trust of buyers.
How can suppliers check the project integration progress?
After signing in, you can click on the avatar in the upper right corner of the website to enter the "My Account - Project History" page, where you can view the progress and status updates of all connected projects and communicate with platform customer service at any time regarding project connection matters.
How can suppliers showcase their supply capabilities? What core information needs to be clarified?
Suppliers can publish their service capabilities through the following steps: After signing in the platform, click the "Demand and Supply" button, then enter the "Supply Square," click the "Showcsae Your Capability" button, and fill in the relevant information according to the page prompts. Key information that needs to be specified includes: service type, industry, country/region, response time, service advantages, contact information, etc. The more detailed and professional the information provided, the easier it is to attract the attention and trust of buyers.
What is the project onboarding process?
Project Matching Process:
1. Post project requirements / supply capabilities – Share your project needs or what you can offer.
2. Intelligent matching & recommendations – The system automatically matches and suggests potential partners.
3. Initial communication – Get in touch to exchange basic information.
4. Confirm cooperation intent – Both parties agree in principle to move forward.
5. Detailed offline negotiation – Discuss specifics in person or in a formal meeting.
Need more help? Click the chatbot, Silky, on the right side.
How to add to desktop关闭
关闭