Carbon Dioxide Capture, Utilization, and Storage (CCUS) Technology
  • 26-04-16 10:19
  • 101
  • 0personFavorited
  • 0personResponded

Inquire Now

Quick response, professional, and efficient — recommended for priority contact.

≤7 daysInterest
Capability Description
View Original

The company has accumulated systematic technical capabilities in carbon capture and resource utilization. The main technical routes include: CO2 capture and purification from cement kiln flue gas (CCS demonstration project), development of process package for 50,000 t/a adsorption-based CO2 capture from power plant flue gas, development of process package for 100,000 t/a CO2 hydrogenation to methanol, engineering design for boiler flue gas CO2 capture combined with nitrogen production, engineering design for new 50,000 t/a food-grade liquid CO2 project, and feasibility study preparation for 100,000 t/a food-grade liquid CO2 project. The technology covers the complete CCUS chain of capture, purification, and conversion utilization. Driven by global carbon neutrality policies, this technical direction holds significant compliance and commercial dual value for industrial enterprises.

Inquire Now
More Recommendations

Key material technology for high-power, high-energy-density lithium batteries

0

0

For scenarios such as electric aviation, high-end equipment, and fast-charging power batteries, lithium-ion batteries are subject to stringent requirements for both high power and high energy density. The bottleneck is concentrated at the level of key materials. This technology focuses on high-power and high-energy-density lithium-ion batteries, developing key materials for the positive and negative electrodes, as well as supporting systems. The positive electrode is optimized for a balance between high specific capacity and structural stability, while the negative electrode is optimized for high capacity retention and lithium precipitation inhibition under fast-charging conditions. In addition, the technology combines electrolyte and electrode structure design to achieve synergy between materials, electrodes, and cells, supporting both high-rate charging and discharging and long-term durability. The technology can directly meet the product upgrade needs of cell manufacturers. At present, a pilot production facility has been built and validated, demonstrating the feasibility of material preparation and cell adaptation, and providing the basis for process scaling. The technology can provide services such as material preparation technology licensing, cell design adaptation support, pilot-scale production and production line construction guidance, performance evaluation, and personnel training.

T - Technology & Patents

Battery pulse electrochemical-mass spectrometry

0

0

This technology is aimed at developing a pulse electrochemical-mass spectrometry (EC-MS) combined analysis system for commercial batteries. It uses pulse electrochemical excitation to simulate dynamic loads under actual battery operating conditions, and combines high-sensitivity mass spectrometry to detect electrolyte gas generation and volatile intermediates in real time, achieving millisecond-level in-situ analysis. This provides direct experimental evidence for key issues such as electrolyte decomposition, gas generation failure, SEI evolution, and fast lithium extraction. The technology is suitable for research and development diagnosis, failure analysis, incoming material evaluation, and safety warning system construction in power batteries, consumer batteries, and energy storage batteries. A pilot installation has been completed and the feasibility and engineering suitability of the method have been verified. We can provide technical support for system installation, test method development, commissioned analysis services, and data interpretation training.

T - Technology & Patents

Carbon Dioxide Capture, Utilization, and Storage (CCUS) Technology
在碳捕集与资源化利用方向积累了系统性的技术能力。主要技术路线涵盖:水泥窑烟气CO2捕集纯化(CCS示范项目)、5万吨/年吸附法捕集电厂烟道气CO2工艺包编制、10万吨/年CO2加氢制甲醇工艺包开发、锅炉烟气CO2捕集联产氮气项目工程设计、5万吨/年食品级液态二氧化碳新建项目工程设计、10万吨/年食品级液态CO2项目可研编制等。技术覆盖了捕集、纯化、转化利用的完整CCUS链条。在全球碳中和政策驱动下,该技术方向对工业企业具有重要的合规与商业双重价值。
Submit Inquiry
Name / Nickname*
Email*
Company(Optional)
Position(Optional)
Phone Number(Optional)
WeChat / WhatsApp Account(Optional)
Brief Description*
Inquiry submitted
Your inquiry has been submitted. Please keep your contact information accessible.
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
FAQ关闭
How do suppliers register on the platform?
After logging in, you can click the "Search" button, then click "All Service Types," scroll to the bottom of the page, and click the "Join Now" button to fill in your service provider's relevant information. The key details required include: service type, industry, country/region, company name, establishment date, company size, etc. The more detailed and professional the information you provide, the easier it is to attract the attention and trust of buyers.
How can suppliers check the project integration progress?
After signing in, you can click on the avatar in the upper right corner of the website to enter the "My Account - Project History" page, where you can view the progress and status updates of all connected projects and communicate with platform customer service at any time regarding project connection matters.
How can suppliers showcase their supply capabilities? What core information needs to be clarified?
Suppliers can publish their service capabilities through the following steps: After signing in the platform, click the "Demand and Supply" button, then enter the "Supply Square," click the "Showcsae Your Capability" button, and fill in the relevant information according to the page prompts. Key information that needs to be specified includes: service type, industry, country/region, response time, service advantages, contact information, etc. The more detailed and professional the information provided, the easier it is to attract the attention and trust of buyers.
What is the project onboarding process?
Project Matching Process:
1. Post project requirements / supply capabilities – Share your project needs or what you can offer.
2. Intelligent matching & recommendations – The system automatically matches and suggests potential partners.
3. Initial communication – Get in touch to exchange basic information.
4. Confirm cooperation intent – Both parties agree in principle to move forward.
5. Detailed offline negotiation – Discuss specifics in person or in a formal meeting.
Need more help? Click the chatbot, Silky, on the right side.
How to add to desktop关闭
关闭