New Zealand Marsden Point Biorefinery (Northland)
  • 26-04-20 21:54
  • 101
  • 0personFavorited
  • 0personResponded

This requirement has passed its deadline. Thank you for your interest.

Closed
Core Requirement Description
View Original

- Investors: Seadra Energy Alliance (including Qantas, Renova, Kent, ANZ)
- Location: Marsden Point (former refinery site)
- Scale: Investment of approximately NZD 300 million
- Products: Sustainable Aviation Fuel (SAF), Biodiesel, Bio-based Chemicals
- Progress: Development agreement signed in October 2024; construction to commence in 2026-2027
- Highlights: Utilizes waste oils and agricultural/forestry residues as feedstock; New Zealand's first large-scale aviation biofuel project

More Recommendations

Procurement and engineering design requirements for Russian modular refinery stationary equipment

• Closed

0

0

The project is located in Russia and is in the conceptual design and project estimation phase of a modular refinery. Non-binding technical proposals and budget quotes are sought. The feedstock is medium-sulfur crude oil, and the plant is designed for an outdoor temperature range of -40 to +40°C. Preference is given to modular/bulk handling. The scope includes common pressure reduction towers and in-tower components, reactors, separators, pressure vessels, tanks/drums, desalination, filters, tube-in-shell heat exchangers, and modular handling, among other stationary equipment. Process packages, FEED, or detailed designs may be provided separately, as may installation guidance, commissioning, and training options. Installation and construction are not included, and Russian customs clearance and certification are the buyer's responsibility. Key equipment involves full vacuum to medium-high pressure and temperatures up to approximately 400°C. Heat exchangers are referenced to TEMA/API 660, and corrosion-resistant solutions may involve NACE and 316L composite or lining. The partner must have the capability to design, manufacture, test, and certify stationary refinery equipment and must be able to submit data tables, manufacturing boundaries, and pricing assumptions.

T - Technology & Patents

E - Engineering Design

P - Procurement

C - Construction

Russian plant oil-based high-grade fatty alcohol integrated facility engineering cooperation requirements

• Closed

0

0

Russia is in the pre-feasibility/conceptual design and CAPEX preliminary assessment stage for a deep-processed vegetable oil project. The proposed facility will include a 10,000-tonne-per-year C12-C14 high-grade fatty alcohol unit, co-producing stearic acid and distilled/pharmaceutical-grade glycerol. The process encompasses oil hydrolysis, fatty acid fractionation and esterification, methyl ester hydrogenation, methanol recovery, fatty alcohol refining, stearic acid granulation, and glycerol evaporation/distillation. We are currently soliciting proposals for: - Process package and technology route comparison - Basic/detailed design - Supply of main and auxiliary equipment - Piping, electrical instrumentation, and automation - Installation guidance - Pre-commissioning, commissioning, and performance testing - Training Hydrogenation options include high-pressure stirred reactors, liquid-phase fixed-bed, and low-pressure gas-phase fixed-bed routes. Key parameters such as hydrogen balance, sunflower seed oil pretreatment, downstream surfactant unit boundaries, and final product specifications remain to be confirmed. Collaborators must have proven track records in similar oil chemical projects, hydrogenation, and vacuum distillation, along with capabilities in license coordination, compliance with Russian/EAEU regulations and GOST/TR CU standards, EAC certification, and EPC interface management.

T - Technology & Patents

E - Engineering Design

P - Procurement

C - Construction

New Zealand Marsden Point Biorefinery (Northland)
- 投资方:Seadra能源联盟(含澳航、Renova、Kent、ANZ)
- 选址:Marsden Point(原炼油厂旧址)
- 规模:投资约3亿新西兰元
- 产品:可持续航空燃料(SAF)、生物柴油、生物基化学品
​- 进度:2024年10月签署开发协议,2026-2027年启动建设
- 亮点:利用废弃油脂、农林废弃物为原料,新西兰首个大型航空生物燃料项目
Respond
Name / Nickname*
Email*
Company(Optional)
Position(Optional)
Phone Number(Optional)
WeChat / WhatsApp Account(Optional)
Brief Description*
Your response has been submitted
Your response request has been submitted. Please keep your contact information accessible.
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
FAQ关闭
How can buyers check the progress of project coordination?
After signing in, you can click on the avatar in the upper right corner of the webpage to view the progress and status updates of all connected projects on the "My Account - Project History" page, and communicate with platform customer service at any time regarding project connection matters.
Can the posted project requirement information be modified later?
You can modify the deadline for posted project requirements. This operation can be performed on the "My Account - Project History - My Posts - Service Demand" page. If your requirements have changed, it is recommended to update the information in a timely manner to ensure that suppliers can stay informed of the latest situation.
How to filter suppliers that meet your requirements? How should filter tags be combined to achieve precise matching?
You can use the platform's filtering function to find suppliers that meet your needs. On the "Demand and Supply - Supply Square" page, you can filter by tags such as service type, industry, country/region, and response time. For more precise matching, it is recommended to combine multiple filtering conditions. Start by using primary conditions (such as service type and industry) to narrow down the scope, then use secondary conditions (such as country/region and response time) to further pinpoint your search.
How can buyers post project requirements? What core information needs to be specified?
Purchasers can post project requirements through the following steps: After signing in the platform, click on "Demand and Supply," enter the "Demand Square," click the "Post Your Requirement" button, and fill in the requirement details as prompted on the page. Information to be filled out includes: service type, industry, country/region, project stage, specific requirements, contact information, etc. The more detailed the requirement information provided, the easier it is to attract suitable suppliers.
What is the project onboarding process?
Project Matching Process:
1. Post project requirements / supply capabilities – Share your project needs or what you can offer.
2. Intelligent matching & recommendations – The system automatically matches and suggests potential partners.
3. Initial communication – Get in touch to exchange basic information.
4. Confirm cooperation intent – Both parties agree in principle to move forward.
5. Detailed offline negotiation – Discuss specifics in person or in a formal meeting.
Need more help? Click the chatbot, Silky, on the right side.
How to add to desktop关闭
关闭