Wet-process phosphate acid with capacity of 700,000t/y----Urgent!
  • 26-04-09 20:24
  • 14
  • 0personFavorited
  • 0personResponded

Respond

Deadline(GMT+4 Arab Standard Time): 2027-10-24,Respond early for priority consideration.

Remaining532Days
Core Requirement Description
View Original

TURN-KEY project for PA . need to break ground on Dec, 2027

Respond
More Recommendations

50,000-ton sodium bicarbonate production line

• Remaining214Days

11

0

Greenland Project - 50,000-ton sodium bicarbonate plant. Urgent! Immediate response required. No financing needed.

T - Technology & Patents

E - Engineering Design

P - Procurement

C - Construction

India 66,000 metric tons per year sodium bicarbonate project

• Closed

27

0

Our company plans to construct an annual 66,000-ton sodium bicarbonate project. We will first proceed with project engineering design, equipment procurement & installation, and project construction bidding. Leveraging local raw material resources and market demand in India, we aim to build a standardized sodium bicarbonate production facility, primarily producing industrial-grade and food-grade sodium bicarbonate to meet supply demands in local food processing, pharmaceuticals, chemicals, environmental protection, and other sectors. This will fill the product supply gap in the region, promote the upgrading of the local chemical industry, deepen practical cooperation between China and India in the chemical sector, and support high-quality local economic development. The core service requirements for this project revolve around the entire process of the 66,000-ton/year sodium bicarbonate production. We will determine the cooperative partner through bidding, requiring them to provide integrated supporting services. The core service content is as follows: Provide core technology and related usage rights suitable for 66,000-ton/year sodium bicarbonate production, optimize process solutions such as carbonation, drying, and forming based on local raw material supply characteristics, prioritize mature energy-saving and environmentally friendly processes to ensure efficient and energy-saving production, with product quality meeting international and local Indian standards; Complete project basic design and detailed design, strictly adhering to local Indian chemical industry regulations, environmental safety laws, and domestic sodium bicarbonate production standards, and deliver design documents that meet construction requirements, focusing on the layout of production workshops, process pipelines, inspection and testing facilities, environmental protection facilities, raw material storage facilities, etc., to ensure smooth project implementation; Assist us in completing the selection and procurement of core production equipment required for the project, focusing on carbonation towers, reaction tanks, dryers, packaging machines, and inspection and testing equipment, ensuring that equipment performance aligns with the 66,000-ton/year production capacity requirements, seamlessly integrates with the production process, balances practicality and economy, prioritizes equipment suitable for local operating conditions and easy maintenance, and guarantees smooth project progress and on-schedule commissioning. The project overall follows the principles of "high efficiency and energy saving, environmental compliance, and quality improvement and efficiency enhancement." The cooperative partner must possess relevant qualifications in sodium bicarbonate production process design and technical services, be proficient in sodium bicarbonate production processes and quality control requirements, familiar with local Indian chemical industry regulations, environmental standards, and raw material supply characteristics, ensuring that project construction complies with local regulatory requirements, helping us achieve the expected economic benefits and industrial driving effects of the project, promoting deeper cooperation between China and India in the chemical sector, and achieving mutual benefit and win-win outcomes.

T - Technology & Patents

E - Engineering Design

P - Procurement

S - Site & Revamp

Wet-process phosphate acid with capacity of 700,000t/y----Urgent!
TURN-KEY project for PA . need to break ground on Dec, 2027
Respond
Name / Nickname*
Email*
Company(Optional)
Position(Optional)
Phone Number(Optional)
WeChat / WhatsApp Account(Optional)
Brief Description*
Your response has been submitted
Your response request has been submitted. Please keep your contact information accessible.
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
FAQ关闭
How can buyers check the progress of project coordination?
After signing in, you can click on the avatar in the upper right corner of the webpage to view the progress and status updates of all connected projects on the "My Account - Project History" page, and communicate with platform customer service at any time regarding project connection matters.
Can the posted project requirement information be modified later?
You can modify the deadline for posted project requirements. This operation can be performed on the "My Account - Project History - My Posts - Service Demand" page. If your requirements have changed, it is recommended to update the information in a timely manner to ensure that suppliers can stay informed of the latest situation.
How to filter suppliers that meet your requirements? How should filter tags be combined to achieve precise matching?
You can use the platform's filtering function to find suppliers that meet your needs. On the "Demand and Supply - Supply Square" page, you can filter by tags such as service type, industry, country/region, and response time. For more precise matching, it is recommended to combine multiple filtering conditions. Start by using primary conditions (such as service type and industry) to narrow down the scope, then use secondary conditions (such as country/region and response time) to further pinpoint your search.
How can buyers post project requirements? What core information needs to be specified?
Purchasers can post project requirements through the following steps: After signing in the platform, click on "Demand and Supply," enter the "Demand Square," click the "Post Your Requirement" button, and fill in the requirement details as prompted on the page. Information to be filled out includes: service type, industry, country/region, project stage, specific requirements, contact information, etc. The more detailed the requirement information provided, the easier it is to attract suitable suppliers.
What is the project onboarding process?
Project Matching Process:
1. Post project requirements / supply capabilities – Share your project needs or what you can offer.
2. Intelligent matching & recommendations – The system automatically matches and suggests potential partners.
3. Initial communication – Get in touch to exchange basic information.
4. Confirm cooperation intent – Both parties agree in principle to move forward.
5. Detailed offline negotiation – Discuss specifics in person or in a formal meeting.
Need more help? Click the chatbot, Silky, on the right side.
How to add to desktop关闭
关闭