Design Project for the Expansion of the Kungrad Soda Plant in Uzbekistan
  • 26-03-20 19:14
  • 13
  • 0personFavorited
  • 0personResponded

This requirement has passed its deadline. Thank you for your interest.

Closed
Core Requirement Description
View Original

Our company plans to implement a design for expanding the annual soda ash production capacity of the Kungrad Soda Plant by 300,000 tons. This project is a key expansion initiative for us. The plant currently has an annual production capacity of 200,000 tons and is the sole soda ash supplier in Central Asia. The expansion will significantly increase capacity, meet the market demand in Uzbekistan and surrounding regions, consolidate its regional position, promote local chemical industry upgrades, and deepen China-Uzbekistan cooperation. As an expansion of the existing soda ash plant, this project can fully utilize existing public facilities and supporting resources. By referencing standards from similar domestic projects, we aim to control investment and construction timelines while balancing economic efficiency and compliance.
The core requirement of this project is the engineering design and supporting services for the 300,000-ton soda ash expansion. We are now inviting bids to select a cooperative unit to provide integrated full-process services. The key requirements are as follows: Provide expansion core technologies and usage rights compatible with the existing soda ash plant, optimize the current ammonia-soda process, address equipment integration and process compatibility issues, and ensure efficient, compliant, and energy-saving production; Complete basic and detailed designs in accordance with local Uzbek regulations and our requirements, aligning with the plant's existing layout, with a focus on designing new core equipment and retrofitting existing facilities, and deliver qualified construction design documents; Assist in the selection and procurement of core equipment to ensure compatibility with the expansion scale and existing equipment, meeting large-scale production needs.
The project follows the principles of "efficient compatibility, energy-saving compliance, and quality and efficiency enhancement." The cooperative unit must possess qualifications for large-scale soda ash expansion services, be proficient in relevant processes, and be familiar with Uzbek chemical industry regulations, GOST-UZ certification, and environmental and safety standards. This will ensure the project progresses compliantly, achieves on-schedule commissioning, realizes economic benefits and industrial driving effects, and deepens practical and mutually beneficial cooperation in the chemical industry between China and Uzbekistan.

More Recommendations

India 66,000 metric tons per year sodium bicarbonate project

• Closed

20

0

Our company plans to construct an annual 66,000-ton sodium bicarbonate project. We will first proceed with project engineering design, equipment procurement & installation, and project construction bidding. Leveraging local raw material resources and market demand in India, we aim to build a standardized sodium bicarbonate production facility, primarily producing industrial-grade and food-grade sodium bicarbonate to meet supply demands in local food processing, pharmaceuticals, chemicals, environmental protection, and other sectors. This will fill the product supply gap in the region, promote the upgrading of the local chemical industry, deepen practical cooperation between China and India in the chemical sector, and support high-quality local economic development. The core service requirements for this project revolve around the entire process of the 66,000-ton/year sodium bicarbonate production. We will determine the cooperative partner through bidding, requiring them to provide integrated supporting services. The core service content is as follows: Provide core technology and related usage rights suitable for 66,000-ton/year sodium bicarbonate production, optimize process solutions such as carbonation, drying, and forming based on local raw material supply characteristics, prioritize mature energy-saving and environmentally friendly processes to ensure efficient and energy-saving production, with product quality meeting international and local Indian standards; Complete project basic design and detailed design, strictly adhering to local Indian chemical industry regulations, environmental safety laws, and domestic sodium bicarbonate production standards, and deliver design documents that meet construction requirements, focusing on the layout of production workshops, process pipelines, inspection and testing facilities, environmental protection facilities, raw material storage facilities, etc., to ensure smooth project implementation; Assist us in completing the selection and procurement of core production equipment required for the project, focusing on carbonation towers, reaction tanks, dryers, packaging machines, and inspection and testing equipment, ensuring that equipment performance aligns with the 66,000-ton/year production capacity requirements, seamlessly integrates with the production process, balances practicality and economy, prioritizes equipment suitable for local operating conditions and easy maintenance, and guarantees smooth project progress and on-schedule commissioning. The project overall follows the principles of "high efficiency and energy saving, environmental compliance, and quality improvement and efficiency enhancement." The cooperative partner must possess relevant qualifications in sodium bicarbonate production process design and technical services, be proficient in sodium bicarbonate production processes and quality control requirements, familiar with local Indian chemical industry regulations, environmental standards, and raw material supply characteristics, ensuring that project construction complies with local regulatory requirements, helping us achieve the expected economic benefits and industrial driving effects of the project, promoting deeper cooperation between China and India in the chemical sector, and achieving mutual benefit and win-win outcomes.

T - Technology & Patents

E - Engineering Design

P - Procurement

S - Site & Revamp

Uzbekistan's Annual Production Project of 24,000 Tons of Flake/Granular Iodized Salt </DATA_TO_TRANSLATE>

• Closed

40

0

Leveraging local salt resources and民生需求 in Uzbekistan, our company plans to construct a standardized iodized salt production facility with an annual capacity of 24,000 tons. The facility will primarily produce flake and granular iodized salt to meet the consumption needs of local residents and small-scale food processing requirements, address the supply gap of qualified iodized salt in the region, contribute to the elimination of iodine deficiency disorders, advance the development of livelihood security, and deepen practical cooperation between China and Uzbekistan in the民生领域. The core service requirements of this project encompass the entire production process for 24,000 tons/year of iodized salt. We will determine our cooperation partner through tender selection, requiring them to provide integrated supporting services. The core service content includes: providing core technologies and related usage rights suitable for producing 24,000 tons/year of flake/granular iodized salt, optimizing process solutions for crushing, iodization, forming, and drying to ensure efficient and energy-efficient production with iodine content meeting both international and Uzbekistan local standards; completing the basic and detailed design of the project, strictly adhering to local Uzbekistan food hygiene, environmental safety regulations, and domestic salt production standards, issuing design documents that meet construction requirements, with key coverage of production workshop layout, process pipelines, inspection and testing facilities, and environmental protection facilities design to ensure smooth implementation; assisting us in the selection and procurement of core production equipment required for the project, with key coverage of iodizing machines, forming machines, drying machines, packaging machines, and inspection and testing equipment, ensuring equipment performance aligns with the 24,000 tons/year production capacity, seamlessly adapts to the production process, balances practicality and economy, and guarantees the smooth progress and on-time commissioning of the project. The project as a whole follows the principles of "meeting quality standards, prioritizing livelihood needs, and ensuring energy efficiency and compliance." The cooperation partner must possess qualifications related to iodized salt production process design and technical services, be proficient in iodized salt production processes and quality control requirements, and be familiar with local Uzbekistan food hygiene and environmental industry regulations to ensure project construction complies with local requirements, help us achieve the expected livelihood and social benefits of the project, deepen China-Uzbekistan cooperation in the livelihood sector, and achieve mutual benefits and win-win outcomes. </DATA_TO_TRANSLATE>

T - Technology & Patents

E - Engineering Design

P - Procurement

S - Site & Revamp

Design Project for the Expansion of the Kungrad Soda Plant in Uzbekistan
我司拟对昆格勒纯碱厂实施30万吨/年纯碱产能扩建设计,该项目为我方重点扩建项目。该厂现有产能20万吨/年,是中亚唯一纯碱供应商,扩建后可大幅提升产能,满足乌兹别克斯坦及周边市场需求,巩固区域地位,同时推动当地化工升级,深化中乌合作。本项目为原有碱厂扩建,可充分利旧现有公用设施及配套资源,参考国内同类项目标准,控制投资与建设周期,兼顾经济性与合规性。
本项目核心需求为30万吨纯碱扩建工程设计及配套服务,现招标选取合作单位提供全流程一体化服务,核心要求如下:提供适配原有碱厂的扩建核心技术及使用权限,结合现有氨碱法工艺优化方案,解决设备衔接、工艺适配问题,确保生产高效合规节能;完成基础与详细设计,遵循乌国当地规范及我方要求,贴合厂区现有布局,重点涵盖新增核心装置及原有设施改造设计,出具合格施工设计文件;协助完成核心设备选型采购,确保设备适配扩建规模、兼容原有设备,满足规模化生产需求。

项目遵循“高效适配、节能合规、提质增效”原则,要求合作单位具备大型纯碱扩建服务资质,熟练掌握相关工艺,熟悉乌国化工法规、GOST-UZ认证及环保安全标准,保障项目合规推进、按期投产,实现经济效益与产业带动作用,深化中乌化工务实合作、互利共赢。
Respond
Name / Nickname*
Email*
Company(Optional)
Position(Optional)
Phone Number(Optional)
WeChat / WhatsApp Account(Optional)
Brief Description*
Your response has been submitted
Your response request has been submitted. Please keep your contact information accessible.
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
FAQ关闭
How can buyers check the progress of project coordination?
After signing in, you can click on the avatar in the upper right corner of the webpage to view the progress and status updates of all connected projects on the "My Account - Project History" page, and communicate with platform customer service at any time regarding project connection matters.
Can the posted project requirement information be modified later?
You can modify the deadline for posted project requirements. This operation can be performed on the "My Account - Project History - My Posts - Service Demand" page. If your requirements have changed, it is recommended to update the information in a timely manner to ensure that suppliers can stay informed of the latest situation.
How to filter suppliers that meet your requirements? How should filter tags be combined to achieve precise matching?
You can use the platform's filtering function to find suppliers that meet your needs. On the "Demand and Supply - Supply Square" page, you can filter by tags such as service type, industry, country/region, and response time. For more precise matching, it is recommended to combine multiple filtering conditions. Start by using primary conditions (such as service type and industry) to narrow down the scope, then use secondary conditions (such as country/region and response time) to further pinpoint your search.
How can buyers post project requirements? What core information needs to be specified?
Purchasers can post project requirements through the following steps: After signing in the platform, click on "Demand and Supply," enter the "Demand Square," click the "Post Your Requirement" button, and fill in the requirement details as prompted on the page. Information to be filled out includes: service type, industry, country/region, project stage, specific requirements, contact information, etc. The more detailed the requirement information provided, the easier it is to attract suitable suppliers.
What is the project onboarding process?
Project Matching Process:
1. Post project requirements / supply capabilities – Share your project needs or what you can offer.
2. Intelligent matching & recommendations – The system automatically matches and suggests potential partners.
3. Initial communication – Get in touch to exchange basic information.
4. Confirm cooperation intent – Both parties agree in principle to move forward.
5. Detailed offline negotiation – Discuss specifics in person or in a formal meeting.
Need more help? Click the chatbot, Silky, on the right side.
How to add to desktop关闭
关闭