Iranian Project for 120,000 Metric Tons of Needle Coke Production Per Year
  • 26-03-20 17:53
  • 23
  • 0personFavorited
  • 0personResponded

This requirement has passed its deadline. Thank you for your interest.

Closed
Core Requirement Description
View Original

This project is for the process optimization and construction technical requirements of a 120,000 tons per year needle coke project in Iran. It is one of our company's key construction projects for 2025. The project is located in a key chemical industrial park in Iran, with an estimated total investment of approximately 1.5 billion RMB.
The main contents of the project include:
1. Introducing advanced needle coke production process technology and patent authorization to break through existing production bottlenecks and improve product quality and unit operation stability.
2. Completing full process design, construction drawing design, and key equipment selection and procurement technical service work.

More Recommendations

India 66,000 metric tons per year sodium bicarbonate project

• Closed

20

0

Our company plans to construct an annual 66,000-ton sodium bicarbonate project. We will first proceed with project engineering design, equipment procurement & installation, and project construction bidding. Leveraging local raw material resources and market demand in India, we aim to build a standardized sodium bicarbonate production facility, primarily producing industrial-grade and food-grade sodium bicarbonate to meet supply demands in local food processing, pharmaceuticals, chemicals, environmental protection, and other sectors. This will fill the product supply gap in the region, promote the upgrading of the local chemical industry, deepen practical cooperation between China and India in the chemical sector, and support high-quality local economic development. The core service requirements for this project revolve around the entire process of the 66,000-ton/year sodium bicarbonate production. We will determine the cooperative partner through bidding, requiring them to provide integrated supporting services. The core service content is as follows: Provide core technology and related usage rights suitable for 66,000-ton/year sodium bicarbonate production, optimize process solutions such as carbonation, drying, and forming based on local raw material supply characteristics, prioritize mature energy-saving and environmentally friendly processes to ensure efficient and energy-saving production, with product quality meeting international and local Indian standards; Complete project basic design and detailed design, strictly adhering to local Indian chemical industry regulations, environmental safety laws, and domestic sodium bicarbonate production standards, and deliver design documents that meet construction requirements, focusing on the layout of production workshops, process pipelines, inspection and testing facilities, environmental protection facilities, raw material storage facilities, etc., to ensure smooth project implementation; Assist us in completing the selection and procurement of core production equipment required for the project, focusing on carbonation towers, reaction tanks, dryers, packaging machines, and inspection and testing equipment, ensuring that equipment performance aligns with the 66,000-ton/year production capacity requirements, seamlessly integrates with the production process, balances practicality and economy, prioritizes equipment suitable for local operating conditions and easy maintenance, and guarantees smooth project progress and on-schedule commissioning. The project overall follows the principles of "high efficiency and energy saving, environmental compliance, and quality improvement and efficiency enhancement." The cooperative partner must possess relevant qualifications in sodium bicarbonate production process design and technical services, be proficient in sodium bicarbonate production processes and quality control requirements, familiar with local Indian chemical industry regulations, environmental standards, and raw material supply characteristics, ensuring that project construction complies with local regulatory requirements, helping us achieve the expected economic benefits and industrial driving effects of the project, promoting deeper cooperation between China and India in the chemical sector, and achieving mutual benefit and win-win outcomes.

T - Technology & Patents

E - Engineering Design

P - Procurement

S - Site & Revamp

Uzbekistan's Annual Production Project of 24,000 Tons of Flake/Granular Iodized Salt </DATA_TO_TRANSLATE>

• Closed

40

0

Leveraging local salt resources and民生需求 in Uzbekistan, our company plans to construct a standardized iodized salt production facility with an annual capacity of 24,000 tons. The facility will primarily produce flake and granular iodized salt to meet the consumption needs of local residents and small-scale food processing requirements, address the supply gap of qualified iodized salt in the region, contribute to the elimination of iodine deficiency disorders, advance the development of livelihood security, and deepen practical cooperation between China and Uzbekistan in the民生领域. The core service requirements of this project encompass the entire production process for 24,000 tons/year of iodized salt. We will determine our cooperation partner through tender selection, requiring them to provide integrated supporting services. The core service content includes: providing core technologies and related usage rights suitable for producing 24,000 tons/year of flake/granular iodized salt, optimizing process solutions for crushing, iodization, forming, and drying to ensure efficient and energy-efficient production with iodine content meeting both international and Uzbekistan local standards; completing the basic and detailed design of the project, strictly adhering to local Uzbekistan food hygiene, environmental safety regulations, and domestic salt production standards, issuing design documents that meet construction requirements, with key coverage of production workshop layout, process pipelines, inspection and testing facilities, and environmental protection facilities design to ensure smooth implementation; assisting us in the selection and procurement of core production equipment required for the project, with key coverage of iodizing machines, forming machines, drying machines, packaging machines, and inspection and testing equipment, ensuring equipment performance aligns with the 24,000 tons/year production capacity, seamlessly adapts to the production process, balances practicality and economy, and guarantees the smooth progress and on-time commissioning of the project. The project as a whole follows the principles of "meeting quality standards, prioritizing livelihood needs, and ensuring energy efficiency and compliance." The cooperation partner must possess qualifications related to iodized salt production process design and technical services, be proficient in iodized salt production processes and quality control requirements, and be familiar with local Uzbekistan food hygiene and environmental industry regulations to ensure project construction complies with local requirements, help us achieve the expected livelihood and social benefits of the project, deepen China-Uzbekistan cooperation in the livelihood sector, and achieve mutual benefits and win-win outcomes. </DATA_TO_TRANSLATE>

T - Technology & Patents

E - Engineering Design

P - Procurement

S - Site & Revamp

Iranian Project for 120,000 Metric Tons of Needle Coke Production Per Year
本项目为伊朗年产 12 万吨针状焦项目工艺优化及建设技术需求,是我公司2025 年度重点建设项目之一。项目位于伊朗重点化工园区,预计总投资约15亿元人民币。
项目主要内容包括:
1. 引进先进的针状焦生产工艺技术与专利授权,突破现有生产瓶颈,提升产品质量与装置运行稳定性。
2. 完成全套工艺设计、施工图设计及关键设备选型与采购技术服务工作。
Respond
Name / Nickname*
Email*
Company(Optional)
Position(Optional)
Phone Number(Optional)
WeChat / WhatsApp Account(Optional)
Brief Description*
Your response has been submitted
Your response request has been submitted. Please keep your contact information accessible.
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
FAQ关闭
How can buyers check the progress of project coordination?
After signing in, you can click on the avatar in the upper right corner of the webpage to view the progress and status updates of all connected projects on the "My Account - Project History" page, and communicate with platform customer service at any time regarding project connection matters.
Can the posted project requirement information be modified later?
You can modify the deadline for posted project requirements. This operation can be performed on the "My Account - Project History - My Posts - Service Demand" page. If your requirements have changed, it is recommended to update the information in a timely manner to ensure that suppliers can stay informed of the latest situation.
How to filter suppliers that meet your requirements? How should filter tags be combined to achieve precise matching?
You can use the platform's filtering function to find suppliers that meet your needs. On the "Demand and Supply - Supply Square" page, you can filter by tags such as service type, industry, country/region, and response time. For more precise matching, it is recommended to combine multiple filtering conditions. Start by using primary conditions (such as service type and industry) to narrow down the scope, then use secondary conditions (such as country/region and response time) to further pinpoint your search.
How can buyers post project requirements? What core information needs to be specified?
Purchasers can post project requirements through the following steps: After signing in the platform, click on "Demand and Supply," enter the "Demand Square," click the "Post Your Requirement" button, and fill in the requirement details as prompted on the page. Information to be filled out includes: service type, industry, country/region, project stage, specific requirements, contact information, etc. The more detailed the requirement information provided, the easier it is to attract suitable suppliers.
What is the project onboarding process?
Project Matching Process:
1. Post project requirements / supply capabilities – Share your project needs or what you can offer.
2. Intelligent matching & recommendations – The system automatically matches and suggests potential partners.
3. Initial communication – Get in touch to exchange basic information.
4. Confirm cooperation intent – Both parties agree in principle to move forward.
5. Detailed offline negotiation – Discuss specifics in person or in a formal meeting.
Need more help? Click the chatbot, Silky, on the right side.
How to add to desktop关闭
关闭