India SPIC Lifting Granulator Procurement Project

2026-03-20 19:20:46

89

0

0

Our company intends to implement the design for a 300,000 tons/year soda ash capacity expansion at the Kungler Soda Ash Plant. This project is a key expansion initiative for us. The plant currently has a capacity of 200,000 tons/year and is the sole soda ash supplier in Central Asia. The expansion will significantly increase capacity to meet the market demand in Uzbekistan and surrounding regions, consolidate its regional position, promote local chemical industry upgrading, and deepen China-Uzbekistan cooperation. As an expansion of the existing soda ash plant, this project can fully utilize existing public facilities and supporting resources. By referencing standards from similar domestic projects, we aim to control investment and construction timelines while balancing economic viability and compliance.

The core requirement of this project is the engineering design and supporting services for the 300,000 tons soda ash expansion. We are now tendering to select a cooperative unit to provide integrated full-process services. The key requirements are as follows: Provide expansion core technology and usage rights compatible with the existing plant, optimize the existing ammonia-soda process, address equipment interfacing and process adaptation issues, and ensure efficient, compliant, and energy-saving production; Complete basic and detailed design in accordance with local Uzbek regulations and our requirements, aligning with the plant's current layout, with a focus on designing new core equipment and retrofitting existing facilities, and deliver qualified construction design documents; Assist in the selection and procurement of core equipment to ensure it matches the expansion scale, is compatible with existing equipment, and meets large-scale production needs.

The project follows the principles of "efficient adaptation, energy-saving compliance, and quality and efficiency improvement." The cooperative unit must possess qualifications for large-scale soda ash expansion services, be proficient in relevant processes, and be familiar with Uzbek chemical industry regulations, GOST-UZ certification, and environmental and safety standards. This will ensure the project progresses compliantly, is commissioned on schedule, achieves economic benefits and industrial driving effects, and deepens practical and mutually beneficial cooperation in the chemical industry between China and Uzbekistan.

Additionally, to meet the production needs of the soda ash plant, our company plans to procure two elevator-type granulators for soda ash granulation, facilitating storage, transportation, and downstream use, thereby enhancing product added value. Referencing standards from similar domestic soda ash plants and India's SPIC soda ash plant, the procurement equipment is of large-capacity type, with a single unit monthly output of 10,000–15,000 tons. Contact parts are made of corrosion-resistant stainless steel, equipped with basic automated control functions, and compatible with existing production lines. The equipment must comply with chemical industry standards and local Indian compliance standards, with a particle degradation rate ≤5% and core components meeting standards. Suppliers must provide comprehensive after-sales service to ensure stable equipment operation and support efficient production at the soda ash plant.

Basic chemical raw material manufacturing

India

P - Procurement

Closed

Design Project for the Expansion of the Kungrad Soda Plant in Uzbekistan

2026-03-20 19:14:52

70

0

0

Our company plans to implement a design for expanding the annual soda ash production capacity of the Kungrad Soda Plant by 300,000 tons. This project is a key expansion initiative for us. The plant currently has an annual production capacity of 200,000 tons and is the sole soda ash supplier in Central Asia. The expansion will significantly increase capacity, meet the market demand in Uzbekistan and surrounding regions, consolidate its regional position, promote local chemical industry upgrades, and deepen China-Uzbekistan cooperation. As an expansion of the existing soda ash plant, this project can fully utilize existing public facilities and supporting resources. By referencing standards from similar domestic projects, we aim to control investment and construction timelines while balancing economic efficiency and compliance.
The core requirement of this project is the engineering design and supporting services for the 300,000-ton soda ash expansion. We are now inviting bids to select a cooperative unit to provide integrated full-process services. The key requirements are as follows: Provide expansion core technologies and usage rights compatible with the existing soda ash plant, optimize the current ammonia-soda process, address equipment integration and process compatibility issues, and ensure efficient, compliant, and energy-saving production; Complete basic and detailed designs in accordance with local Uzbek regulations and our requirements, aligning with the plant's existing layout, with a focus on designing new core equipment and retrofitting existing facilities, and deliver qualified construction design documents; Assist in the selection and procurement of core equipment to ensure compatibility with the expansion scale and existing equipment, meeting large-scale production needs.
The project follows the principles of "efficient compatibility, energy-saving compliance, and quality and efficiency enhancement." The cooperative unit must possess qualifications for large-scale soda ash expansion services, be proficient in relevant processes, and be familiar with Uzbek chemical industry regulations, GOST-UZ certification, and environmental and safety standards. This will ensure the project progresses compliantly, achieves on-schedule commissioning, realizes economic benefits and industrial driving effects, and deepens practical and mutually beneficial cooperation in the chemical industry between China and Uzbekistan.

Basic chemical raw material manufacturing

Uzbekistan

T - Technology & Patents

E - Engineering Design

P - Procurement

S - Site & Revamp

Closed

Design Project for Iodine, Bromine, and Bromine Derivative Plant in Turkmenistan

2026-03-20 19:12:27

72

0

0

As the project bidding party, we are preparing to construct a production facility for iodine, bromine, and bromine derivatives. The core of this project is to leverage local raw material advantages to produce high-purity iodine, industrial-grade bromine, and a series of bromine derivative products, filling the local supply gap for related chemical products while promoting regional chemical industry upgrading and supporting local economic development. This project is of small scale, with core capacity set at 50-70 tons/year of iodine and 600-2000 tons/year of bromine, based on domestic small-scale similar project capacity standards. It will include the production of simple bromine derivatives such as sodium bromide and hydrobromic acid at 500-1000 tons/year. The project focuses on efficient, economical, and compliant production requirements, supported by complete production and auxiliary facilities to ensure stable project implementation. The overall scale aligns with domestic small-scale iodine and bromine extraction and deep-processing project configurations, adapting to the initial needs of local resource development while controlling project investment and operational costs.

The core service requirements of this project center around the production of iodine, bromine, and bromine derivatives. Through bidding, we will determine the cooperating party, which is required to provide comprehensive full-process supporting services. The core service contents include: providing core technology for iodine and bromine extraction and bromine derivative synthesis suitable for small-scale factories, granting relevant technology usage rights to ensure production processes are compliant and efficient; completing basic and detailed project design in strict accordance with local chemical industry standards and our requirements, issuing design documents that meet standards to ensure smooth construction; assisting us in the selection and procurement of core production equipment, with emphasis on iodine and bromine extraction equipment, reaction equipment, purification equipment, and supporting instruments, ensuring equipment performance is suitable for small-scale production and meets the production requirements for iodine, bromine, and bromine derivatives.

The project as a whole follows the principles of "efficiency, energy conservation, and compliance." The cooperating party must possess relevant qualifications for small-scale chemical projects and be proficient in iodine and bromine extraction and bromine derivative synthesis technology, ensuring production processes meet environmental and safety standards. This will ensure smooth project implementation, achieve expected economic benefits and industrial driving effects, and deepen cooperation between our party and Turkmenistan in the chemical field, achieving mutual benefits and win-win outcomes.

Fine Chemical Manufacturing

Turkmenistan

T - Technology & Patents

E - Engineering Design

P - Procurement

S - Site & Revamp

Closed

India Dry Flue Gas Desulfurization Project

2026-03-20 19:10:17

80

0

0

We plan to construct a key environmental protection supporting project with a capacity of 500,000 Nm³/h for dry flue gas desulfurization to treat industrial sulfur-containing flue gas, achieve ultra-low SO₂ emissions, and support environmental compliance, green production, and regional air quality improvement. This project adopts advanced and mature dry process technology suitable for the main production unit's requirements. We are now bidding to select qualified partners to provide full-process integrated technology and engineering services, with specific requirements as follows:

1. Technical Support and Patent Authorization: Provide complete set of core dry desulfurization technology suitable for this scale and comprehensive technical support to ensure desulfurization efficiency ≥98%; Grant legal usage rights for related core technology patents and provide authorization documents to avoid infringement risks, while also providing supporting services such as technical disclosure and personnel training.

2. Full-Process Engineering Design: Responsible for basic engineering design and detailed construction drawing design, following relevant specifications, completing core work such as process package preparation, equipment selection, general layout, and construction drawings for various facilities, issuing qualified design documents, and coordinating with design disclosure and changes.

3. Equipment Procurement Services: In accordance with project scale and process requirements, complete selection of core and auxiliary equipment and supplier screening, assist us in procurement negotiations and quality inspection, control equipment quality, coordinate with equipment transportation and handover, and ensure timely delivery.

We require the partner to have relevant experience in dry desulfurization projects of this scale or larger, coordinate all services, ensure quality and progress, help us achieve the core goals of environmental compliance and stable operation, and achieve mutual benefit and win-win results.

Basic chemical raw material manufacturing

Fine Chemical Manufacturing

Environmental Engineering

India

T - Technology & Patents

E - Engineering Design

P - Procurement

S - Site & Revamp

Closed

Kazakhstan Industrial Park Project (Soda Ash Plant, Glass Plant)

2026-03-20 18:03:57

73

0

0

This project addresses the process technology and engineering construction requirements for a 200,000 tons per year soda ash plant in Kazakhstan and is a key construction project for our company in 2025. The project is located in a key chemical industrial park in Kazakhstan, with an estimated total investment of approximately 1.8 billion RMB.
The main services provided by the project include:
1. Providing advanced soda ash process technology and patent licensing, optimizing the process flow of the equipment, and resolving issues related to raw material adaptability, energy consumption, and production capacity bottlenecks.
2. Completing the entire process engineering design work, including process package design, basic engineering design, and detailed construction drawing design.
3. Providing support services for core equipment selection, technical negotiations, and procurement to ensure stable, efficient, and long-cycle operation of the equipment.

Basic chemical raw material manufacturing

Kazakhstan

T - Technology & Patents

E - Engineering Design

P - Procurement

S - Site & Revamp

Closed

Iranian Project for 120,000 Metric Tons of Needle Coke Production Per Year

2026-03-20 17:53:07

71

0

0

This project is for the process optimization and construction technical requirements of a 120,000 tons per year needle coke project in Iran. It is one of our company's key construction projects for 2025. The project is located in a key chemical industrial park in Iran, with an estimated total investment of approximately 1.5 billion RMB.
The main contents of the project include:
1. Introducing advanced needle coke production process technology and patent authorization to break through existing production bottlenecks and improve product quality and unit operation stability.
2. Completing full process design, construction drawing design, and key equipment selection and procurement technical service work.

Fine Chemical Manufacturing

Iran

Basic chemical raw material manufacturing

fine chemical manufacturing

T - Technology & Patents

E - Engineering Design

P - Procurement

S - Site & Revamp

Closed

Russian Cyanide Salt Process Package Project

2026-03-20 11:25:10

64

0

0

We are the bidding party for the project and plan to construct the Russian cyanide salt process package project. Based on the local chemical industry foundation and market demand in Russia, we focus on the production of core cyanide salt products and provide a complete set of process package services. We not only meet the compliance needs of cyanide salt in the fields of mining and smelting, chemical intermediates, etc. in Russia, but also strictly follow local chemical safety and environmental regulations and international standards. We deepen practical cooperation in the chemical industry between China and Russia, and help upgrade the compliance of the local chemical industry.
The core service requirements of this project revolve around the cyanide salt process package. We have determined the cooperating unit through bidding and require them to provide integrated process package supporting services. The core service content is as follows: providing cyanide salt production core technology and patent authorization that is suitable for the scale of the Russian project, strictly following the "Cyanide Safety Production Management Regulations" and local safety standards in Russia, optimizing the process plan, and solving key issues such as safety prevention and control, abnormal working condition disposal, and environmental compliance in the production of highly toxic chemicals; Complete the full process design of the process package, covering basic design, detailed design, with a focus on strengthening safety protection, waste gas and wastewater treatment, hydrogen cyanide temperature control, and other design contents to ensure compliance, safety, and feasibility of the process package; Assist us in completing equipment selection guidance related to the process package, ensuring seamless compatibility between equipment performance and the process package, and guaranteeing safe, efficient, and compliant production in the future of the project.
The overall project follows the principles of "safety and compliance, high efficiency and energy conservation, and strict risk control". The cooperating units need to have relevant qualifications for cyanide salt process package design and technical services, be proficient in cyanide salt production processes and safety control requirements for highly toxic chemicals, be familiar with local chemical industry regulations and environmental standards in Russia, ensure that the process package meets local compliance requirements, help us achieve the expected goals of the project, promote deepening cooperation in the chemical industry between China and Russia, and achieve mutual benefit and win-win results.

Fine Chemical Manufacturing

Russia

T - Technology & Patents

E - Engineering Design

P - Procurement

S - Site & Revamp

Closed
SRC Posts

俄罗斯连续式热裂解装置固体残渣连续排出系统优化专家寻访

• Closed

40

0

本项目为俄罗斯客户 SIBUR INTERNATIONAL 的试验级连续式热裂解装置技术优化需求。项目方目前希望引入具备连续式热裂解装置运行和/或设计经验的工程专家,对装置中固体炭渣/固体残渣连续排出系统运行不稳定的问题进行技术诊断,并提出结构改造及运行优化建议,目标是支持装置实现不少于 72 小时的连续稳定运行。 本次需求的核心问题集中在连续式热裂解过程中干态固体残渣的稳定排出。现有排出系统可能存在粘结、架桥、压实、堵塞、排出区域瓶颈、密封性或气密性不足等问题,需要专家结合设计文件、工艺文件、运行数据及固体残渣样品检测数据进行综合判断,识别导致排出系统不稳定的根本原因。 专家/顾问的主要工作内容包括:审阅试验级连续热裂解装置的设计文件与工艺文件;分析固体残渣样品及检测数据;评估固体残渣连续排出系统的结构、密封、输送及运行逻辑;提出排出单元或系统的结构改造建议;提出运行工况及操作参数优化建议;必要时赴俄罗斯叶卡捷琳堡现场进行设备审计,评估装置在实际运行状态下的技术状况。 最终希望形成书面工程分析报告,内容包括根因分析结论、推荐改造措施、运行工况优化建议、备选方案、可行性评估及初步实施周期。项目可根据实际需要进一步邀请专家支持改造后排出单元的安装、调试和连续运行验证,确认装置达到连续稳定运行不少于 72 小时的目标。 候选专家应具备连续式热裂解装置运行和/或设计相关实操经验,并具有干态固体残渣连续排出系统方面的成熟经验。专家应熟悉机械结构、材料、热工/热力学、粉体或固体输送、高温残渣处理、密封与气密结构、防粘结、防架桥、防压实等相关技术问题。能够通过视频会议高效沟通,并输出清晰的技术报告。 具备英语沟通能力、国际项目经验,或可赴俄罗斯叶卡捷琳堡现场支持 2–4 周者优先。如专业能力突出,英语能力可不作为强制要求。 参考目标专家来源包括但不限于:BESTON GRO

T - Technology & Patents

E - Engineering Design

S - Site & Revamp

H - Human Resources

Urgent Tasks

Russian Steam Turbine Maintenance Services

• Remaining44Days

0

0

Phase 1 includes procedures for complete disassembly inspection, gas generator support repair, compressor rotor/stator repair, combustion chamber repair, and turbine rotor repair. The work scope covers removing all pipelines from the complete machine and disassembling it down to individual parts, cleaning parts, dimensional tolerance inspection, non-destructive testing (NDT), and issuing a GTD defect list to confirm scrapping criteria with the customer; sequentially processing each stage of the gas generator supports, compressor stationary and rotating parts, combustion chamber, and turbine rotor, replacing damaged blades, seals, fuel injectors, thermocouples and other components, repairing coatings and sealing surfaces, and performing component runout control and dynamic balancing. Phase 2 carries out repair work on the turbine stator, power turbine rotor, and power turbine stator, repairing various sealing clearances, nozzles, blade coatings, replacing damaged components, correcting dynamic balance, and completing all turbine stationary and rotor component repairs. Phase 3 performs engine final assembly, mandatorily replacing all original bearings of the drive box; preparing overhaul execution documents and completion reports and communicating with the customer; completing equipment insulation, nameplate, wiring, and overall protective packaging, and transporting the gas turbine engine to the customer's plant using an air-suspension special vehicle. Phase 4 covers the on-site acceptance testing stage. Within 72 hours after the equipment arrives at the customer site, the complete-machine acceptance test run shall be conducted. The test plan is prepared by the contractor and confirmed by the customer; the repaired gas turbine replaces the original unit and undergoes a continuous 72-hour trial operation. The total duration of all procedures for complete machine replacement, repair, and testing shall not exceed 14 calendar days. After the test, a complete set of execution documents shall be submitted.

S - Site & Revamp

With 1,000+ quality service providers, we help you quickly find the right professional team to efficiently solve your chemical project challenges.
+ Post Requirement Now
Over 1,200 requirements have been successfully matched on this platform.
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
FAQ关闭
How can buyers check the progress of project coordination?
After signing in, you can click on the avatar in the upper right corner of the webpage to view the progress and status updates of all connected projects on the "My Account - Project History" page, and communicate with platform customer service at any time regarding project connection matters.
Can the posted project requirement information be modified later?
You can modify the deadline for posted project requirements. This operation can be performed on the "My Account - Project History - My Posts - Service Demand" page. If your requirements have changed, it is recommended to update the information in a timely manner to ensure that suppliers can stay informed of the latest situation.
How to filter suppliers that meet your requirements? How should filter tags be combined to achieve precise matching?
You can use the platform's filtering function to find suppliers that meet your needs. On the "Demand and Supply - Supply Square" page, you can filter by tags such as service type, industry, country/region, and response time. For more precise matching, it is recommended to combine multiple filtering conditions. Start by using primary conditions (such as service type and industry) to narrow down the scope, then use secondary conditions (such as country/region and response time) to further pinpoint your search.
How can buyers post project requirements? What core information needs to be specified?
Purchasers can post project requirements through the following steps: After signing in the platform, click on "Demand and Supply," enter the "Demand Square," click the "Post Your Requirement" button, and fill in the requirement details as prompted on the page. Information to be filled out includes: service type, industry, country/region, project stage, specific requirements, contact information, etc. The more detailed the requirement information provided, the easier it is to attract suitable suppliers.
What is the project onboarding process?
Project Matching Process:
1. Post project requirements / supply capabilities – Share your project needs or what you can offer.
2. Intelligent matching & recommendations – The system automatically matches and suggests potential partners.
3. Initial communication – Get in touch to exchange basic information.
4. Confirm cooperation intent – Both parties agree in principle to move forward.
5. Detailed offline negotiation – Discuss specifics in person or in a formal meeting.
Need more help? Click the chatbot, Silky, on the right side.
How to add to desktop关闭
关闭