Demand Square

Post project requirements and connect with over 1,000+ quality suppliers worldwide

+ Post Your Requirement

Wet-process phosphate acid with capacity of 700,000t/y----Urgent!

2026-04-09 20:24:37

70

0

0

TURN-KEY project for PA . need to break ground on Dec, 2027

EPC General Contracting and Project Management

United Arab Emirates

T - Technology & Patents

E - Engineering Design

P - Procurement

Remaining463Days

50,000-ton sodium bicarbonate production line

2026-04-09 20:13:47

64

0

0

Greenland Project - 50,000-ton sodium bicarbonate plant. Urgent! Immediate response required. No financing needed.

EPC General Contracting and Project Management

Middle East

T - Technology & Patents

E - Engineering Design

P - Procurement

C - Construction

Remaining145Days

Small-scale production needs for daily chemical raw materials

2026-04-13 15:16:52

52

0

0

A small-scale production validation for powdered cosmetic raw materials is required, with a capacity specification ranging from several kilograms to tens of kilograms per batch. Core requirements:  
Equipment configuration: Must possess a complete production line for freeze drying and solid powder mixing;  
Production conditions: Must have a cleanroom compliant with cosmetic production standards (GMP) and independent production capabilities;  
Raw material scope: Feedstock components are primarily peptide-based, while also including other commonly used cosmetic-grade raw materials, and all raw materials have been included in the "Inventory of Used Cosmetic Raw Materials."  
We sincerely invite enterprises with capabilities in OEM/production technology for cosmetic powder raw materials to connect and collaborate.

Chemical Engineering Technology Research and Development and Process Package

Pakistan

T - Technology & Patents

Closed

Pilot-scale Production of Food Additives

2026-04-13 14:46:31

59

0

0

We currently have a laboratory-scale process plan for a food additive, which requires process scale-up, pilot-scale verification and optimization. The ultimate goal is to deliver key industrial production parameters such as the optimal material ratio, reaction temperature, reaction time, etc., and to provide equipment selection recommendations for industrial-scale production. We sincerely invite organizations with relevant pilot-scale amplification capabilities to discuss potential collaboration.

Chemical Engineering Technology Research and Development and Process Package

China

T - Technology & Patents

Closed

Requirements for Powder High-Temperature Sintering

2026-04-13 14:13:57

59

0

0

Project Requirements: High-temperature calcination of powdered raw materials with a total weight of 200kg. The process conditions involve constant-temperature calcination at 840°C for 2 hours. The sintering process can be completed in batches, ultimately producing calcined coal gangue as the final product. Companies with relevant calcination equipment and technical capabilities are welcome to contact for cooperation.

Petrochemical and Coal Chemical Industries

China

T - Technology & Patents

Closed

Regarding the demand for small-scale customized production of daily chemical raw materials

2026-04-04 00:25:00

72

0

0

I. Core Production Requirements
This request pertains to small-scale customized production services for powder-based cosmetics and daily chemical raw materials, focusing on the small-batch preparation of peptide active ingredients and compliant daily chemical raw materials. It is tailored for scenarios such as R&D sampling, formula verification, and small-batch trial production. Specific requirements are as follows:
Production Scale: Single-batch output covers the range from a few kilograms to tens of kilograms, flexibly adapting to usage needs at different R&D stages, supporting flexible production for multiple small batches.
Core Process and Equipment Requirements
Must possess freeze-drying (lyophilization) process capabilities, equipped with professional freeze-drying equipment, to meet the drying and shaping needs of heat-sensitive active ingredients such as peptides, ensuring raw material activity and stability;
Must be equipped with precise mixing equipment for solid powders to achieve uniform blending of multi-component raw materials, meeting the homogeneity requirements of cosmetic formulas;
Must have a clean production workshop compliant with cosmetic production regulations, meeting environmental control requirements for daily chemical raw material production.
Raw Material Attributes
Production raw materials are primarily peptide active ingredients, combined with other common cosmetic excipients;
All raw materials are listed in the "Catalog of Cosmetics Raw Materials Already in Use" and comply with national cosmetic regulatory requirements, containing no prohibited ingredients.

II. Cooperation Requirements
The partner must possess relevant qualifications for cosmetics raw material production and be familiar with compliance processes and quality control standards for daily chemical raw material production;
Can provide full-process production services from raw material pretreatment, freeze-drying, mixing, to finished product packaging, supporting customized process adjustments;
Can cooperate with R&D teams for process optimization and small-scale pilot scale-up, ensuring process traceability and product quality stability;
Enterprises with relevant production capabilities and technical strength are welcome to contact for discussions. Production proposals, qualification documents, and cooperation quotations can be provided.

Fine Chemical Manufacturing

Vietnam

T - Technology & Patents

Closed

Dalian Construction Annual Production 30wt Baking Soda Alkali Plant

2026-03-30 17:05:55

78

1

0

Constructing an alkali plant in Jinzhou District, Dalian

Basic chemical raw material manufacturing

China

E - Engineering Design

P - Procurement

C - Construction

Closed

India 66,000 metric tons per year sodium bicarbonate project

2026-03-20 19:30:50

99

0

0

Our company plans to construct an annual 66,000-ton sodium bicarbonate project. We will first proceed with project engineering design, equipment procurement & installation, and project construction bidding. Leveraging local raw material resources and market demand in India, we aim to build a standardized sodium bicarbonate production facility, primarily producing industrial-grade and food-grade sodium bicarbonate to meet supply demands in local food processing, pharmaceuticals, chemicals, environmental protection, and other sectors. This will fill the product supply gap in the region, promote the upgrading of the local chemical industry, deepen practical cooperation between China and India in the chemical sector, and support high-quality local economic development.

The core service requirements for this project revolve around the entire process of the 66,000-ton/year sodium bicarbonate production. We will determine the cooperative partner through bidding, requiring them to provide integrated supporting services. The core service content is as follows: Provide core technology and related usage rights suitable for 66,000-ton/year sodium bicarbonate production, optimize process solutions such as carbonation, drying, and forming based on local raw material supply characteristics, prioritize mature energy-saving and environmentally friendly processes to ensure efficient and energy-saving production, with product quality meeting international and local Indian standards; Complete project basic design and detailed design, strictly adhering to local Indian chemical industry regulations, environmental safety laws, and domestic sodium bicarbonate production standards, and deliver design documents that meet construction requirements, focusing on the layout of production workshops, process pipelines, inspection and testing facilities, environmental protection facilities, raw material storage facilities, etc., to ensure smooth project implementation; Assist us in completing the selection and procurement of core production equipment required for the project, focusing on carbonation towers, reaction tanks, dryers, packaging machines, and inspection and testing equipment, ensuring that equipment performance aligns with the 66,000-ton/year production capacity requirements, seamlessly integrates with the production process, balances practicality and economy, prioritizes equipment suitable for local operating conditions and easy maintenance, and guarantees smooth project progress and on-schedule commissioning.

The project overall follows the principles of "high efficiency and energy saving, environmental compliance, and quality improvement and efficiency enhancement." The cooperative partner must possess relevant qualifications in sodium bicarbonate production process design and technical services, be proficient in sodium bicarbonate production processes and quality control requirements, familiar with local Indian chemical industry regulations, environmental standards, and raw material supply characteristics, ensuring that project construction complies with local regulatory requirements, helping us achieve the expected economic benefits and industrial driving effects of the project, promoting deeper cooperation between China and India in the chemical sector, and achieving mutual benefit and win-win outcomes.

Basic chemical raw material manufacturing

India

T - Technology & Patents

E - Engineering Design

P - Procurement

S - Site & Revamp

Closed

Uzbekistan's Annual Production Project of 24,000 Tons of Flake/Granular Iodized Salt </DATA_TO_TRANSLATE>

2026-03-20 19:28:16

97

0

0

Leveraging local salt resources and民生需求 in Uzbekistan, our company plans to construct a standardized iodized salt production facility with an annual capacity of 24,000 tons. The facility will primarily produce flake and granular iodized salt to meet the consumption needs of local residents and small-scale food processing requirements, address the supply gap of qualified iodized salt in the region, contribute to the elimination of iodine deficiency disorders, advance the development of livelihood security, and deepen practical cooperation between China and Uzbekistan in the民生领域.

The core service requirements of this project encompass the entire production process for 24,000 tons/year of iodized salt. We will determine our cooperation partner through tender selection, requiring them to provide integrated supporting services. The core service content includes: providing core technologies and related usage rights suitable for producing 24,000 tons/year of flake/granular iodized salt, optimizing process solutions for crushing, iodization, forming, and drying to ensure efficient and energy-efficient production with iodine content meeting both international and Uzbekistan local standards; completing the basic and detailed design of the project, strictly adhering to local Uzbekistan food hygiene, environmental safety regulations, and domestic salt production standards, issuing design documents that meet construction requirements, with key coverage of production workshop layout, process pipelines, inspection and testing facilities, and environmental protection facilities design to ensure smooth implementation; assisting us in the selection and procurement of core production equipment required for the project, with key coverage of iodizing machines, forming machines, drying machines, packaging machines, and inspection and testing equipment, ensuring equipment performance aligns with the 24,000 tons/year production capacity, seamlessly adapts to the production process, balances practicality and economy, and guarantees the smooth progress and on-time commissioning of the project.

The project as a whole follows the principles of "meeting quality standards, prioritizing livelihood needs, and ensuring energy efficiency and compliance." The cooperation partner must possess qualifications related to iodized salt production process design and technical services, be proficient in iodized salt production processes and quality control requirements, and be familiar with local Uzbekistan food hygiene and environmental industry regulations to ensure project construction complies with local requirements, help us achieve the expected livelihood and social benefits of the project, deepen China-Uzbekistan cooperation in the livelihood sector, and achieve mutual benefits and win-win outcomes.

Basic chemical raw material manufacturing

Fine Chemical Manufacturing

Uzbekistan

T - Technology & Patents

E - Engineering Design

P - Procurement

S - Site & Revamp

Closed

Pakistan 200,000 Tons Soda Ash + 25,000 Tons Baking Soda Project

2026-03-20 19:23:33

70

0

0

We are the project owner preparing to construct a 200,000 tons/year soda ash and 25,000 tons/year sodium bicarbonate project. Leveraging local raw material resources and geographical advantages in Pakistan, we will build a joint production facility for soda ash and sodium bicarbonate. This project will meet the market demand for soda ash and sodium bicarbonate in local industries such as chemicals, building materials, and food processing, fill the supply gap in the region, promote the upgrade of the local chemical industry, deepen pragmatic cooperation in the chemical sector between China and Pakistan, and contribute to high-quality economic development. The project will adopt a mature and efficient joint production process, balancing energy conservation, environmental protection, and economic viability. Referencing investment and construction standards of similar domestic projects, we will reasonably control project costs and construction cycles to create a large-scale, standardized, and modern chemical production base.

The core service requirements for this project revolve around the full process of technology, design, and procurement for the joint production facility. We will determine the cooperating unit through tendering, requiring them to provide integrated supporting services. The core service contents are as follows: Provide core technology and relevant usage rights adapted for the joint production of 200,000 tons of soda ash and 25,000 tons of sodium bicarbonate; optimize the process scheme based on the actual project conditions; and resolve key issues such as material connection and energy consumption control in the coordinated production of the two products to ensure an efficient and compliant production process. Complete the basic design and detailed design of the project, strictly adhering to local chemical industry regulations, environmental and safety standards in Pakistan, and our requirements, and issue design documents meeting construction needs, with a focus on the design of core facilities such as soda ash calcination, carbonation, sodium bicarbonate synthesis, and drying, ensuring smooth implementation of construction. Assist us in completing the selection and procurement of core production equipment required for the project, covering key equipment such as ammonia stripping towers, carbonation towers, and dryers, along with supporting instrumentation. Ensure that the equipment performance aligns with the project's capacity requirements, seamlessly adapts to the production process, and guarantees the smooth advancement and on-time commissioning of the project.

The overall project follows the principles of "efficient collaboration, energy conservation and compliance, quality improvement and efficiency enhancement." The cooperating unit must possess relevant service qualifications for joint production projects of soda ash and sodium bicarbonate, be proficient in related production process technologies, and be familiar with local chemical industry regulations and environmental and safety standards in Pakistan. This ensures that the project construction complies with local regulatory requirements, helps us achieve the expected economic benefits and industrial driving effects of the project, promotes the deepening of cooperation in the chemical sector between China and Pakistan, and achieves mutual benefit and win-win outcomes.

Basic chemical raw material manufacturing

Pakistan

T - Technology & Patents

E - Engineering Design

P - Procurement

S - Site & Revamp

Closed
SRC Posts

俄罗斯连续式热裂解装置固体残渣连续排出系统优化专家寻访

• Closed

40

0

本项目为俄罗斯客户 SIBUR INTERNATIONAL 的试验级连续式热裂解装置技术优化需求。项目方目前希望引入具备连续式热裂解装置运行和/或设计经验的工程专家,对装置中固体炭渣/固体残渣连续排出系统运行不稳定的问题进行技术诊断,并提出结构改造及运行优化建议,目标是支持装置实现不少于 72 小时的连续稳定运行。 本次需求的核心问题集中在连续式热裂解过程中干态固体残渣的稳定排出。现有排出系统可能存在粘结、架桥、压实、堵塞、排出区域瓶颈、密封性或气密性不足等问题,需要专家结合设计文件、工艺文件、运行数据及固体残渣样品检测数据进行综合判断,识别导致排出系统不稳定的根本原因。 专家/顾问的主要工作内容包括:审阅试验级连续热裂解装置的设计文件与工艺文件;分析固体残渣样品及检测数据;评估固体残渣连续排出系统的结构、密封、输送及运行逻辑;提出排出单元或系统的结构改造建议;提出运行工况及操作参数优化建议;必要时赴俄罗斯叶卡捷琳堡现场进行设备审计,评估装置在实际运行状态下的技术状况。 最终希望形成书面工程分析报告,内容包括根因分析结论、推荐改造措施、运行工况优化建议、备选方案、可行性评估及初步实施周期。项目可根据实际需要进一步邀请专家支持改造后排出单元的安装、调试和连续运行验证,确认装置达到连续稳定运行不少于 72 小时的目标。 候选专家应具备连续式热裂解装置运行和/或设计相关实操经验,并具有干态固体残渣连续排出系统方面的成熟经验。专家应熟悉机械结构、材料、热工/热力学、粉体或固体输送、高温残渣处理、密封与气密结构、防粘结、防架桥、防压实等相关技术问题。能够通过视频会议高效沟通,并输出清晰的技术报告。 具备英语沟通能力、国际项目经验,或可赴俄罗斯叶卡捷琳堡现场支持 2–4 周者优先。如专业能力突出,英语能力可不作为强制要求。 参考目标专家来源包括但不限于:BESTON GRO

T - Technology & Patents

E - Engineering Design

S - Site & Revamp

H - Human Resources

Urgent Tasks

Russian Steam Turbine Maintenance Services

• Remaining44Days

0

0

Phase 1 includes procedures for complete disassembly inspection, gas generator support repair, compressor rotor/stator repair, combustion chamber repair, and turbine rotor repair. The work scope covers removing all pipelines from the complete machine and disassembling it down to individual parts, cleaning parts, dimensional tolerance inspection, non-destructive testing (NDT), and issuing a GTD defect list to confirm scrapping criteria with the customer; sequentially processing each stage of the gas generator supports, compressor stationary and rotating parts, combustion chamber, and turbine rotor, replacing damaged blades, seals, fuel injectors, thermocouples and other components, repairing coatings and sealing surfaces, and performing component runout control and dynamic balancing. Phase 2 carries out repair work on the turbine stator, power turbine rotor, and power turbine stator, repairing various sealing clearances, nozzles, blade coatings, replacing damaged components, correcting dynamic balance, and completing all turbine stationary and rotor component repairs. Phase 3 performs engine final assembly, mandatorily replacing all original bearings of the drive box; preparing overhaul execution documents and completion reports and communicating with the customer; completing equipment insulation, nameplate, wiring, and overall protective packaging, and transporting the gas turbine engine to the customer's plant using an air-suspension special vehicle. Phase 4 covers the on-site acceptance testing stage. Within 72 hours after the equipment arrives at the customer site, the complete-machine acceptance test run shall be conducted. The test plan is prepared by the contractor and confirmed by the customer; the repaired gas turbine replaces the original unit and undergoes a continuous 72-hour trial operation. The total duration of all procedures for complete machine replacement, repair, and testing shall not exceed 14 calendar days. After the test, a complete set of execution documents shall be submitted.

S - Site & Revamp

With 1,000+ quality service providers, we help you quickly find the right professional team to efficiently solve your chemical project challenges.
+ Post Requirement Now
Over 1,200 requirements have been successfully matched on this platform.
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
FAQ关闭
How can buyers check the progress of project coordination?
After signing in, you can click on the avatar in the upper right corner of the webpage to view the progress and status updates of all connected projects on the "My Account - Project History" page, and communicate with platform customer service at any time regarding project connection matters.
Can the posted project requirement information be modified later?
You can modify the deadline for posted project requirements. This operation can be performed on the "My Account - Project History - My Posts - Service Demand" page. If your requirements have changed, it is recommended to update the information in a timely manner to ensure that suppliers can stay informed of the latest situation.
How to filter suppliers that meet your requirements? How should filter tags be combined to achieve precise matching?
You can use the platform's filtering function to find suppliers that meet your needs. On the "Demand and Supply - Supply Square" page, you can filter by tags such as service type, industry, country/region, and response time. For more precise matching, it is recommended to combine multiple filtering conditions. Start by using primary conditions (such as service type and industry) to narrow down the scope, then use secondary conditions (such as country/region and response time) to further pinpoint your search.
How can buyers post project requirements? What core information needs to be specified?
Purchasers can post project requirements through the following steps: After signing in the platform, click on "Demand and Supply," enter the "Demand Square," click the "Post Your Requirement" button, and fill in the requirement details as prompted on the page. Information to be filled out includes: service type, industry, country/region, project stage, specific requirements, contact information, etc. The more detailed the requirement information provided, the easier it is to attract suitable suppliers.
What is the project onboarding process?
Project Matching Process:
1. Post project requirements / supply capabilities – Share your project needs or what you can offer.
2. Intelligent matching & recommendations – The system automatically matches and suggests potential partners.
3. Initial communication – Get in touch to exchange basic information.
4. Confirm cooperation intent – Both parties agree in principle to move forward.
5. Detailed offline negotiation – Discuss specifics in person or in a formal meeting.
Need more help? Click the chatbot, Silky, on the right side.
How to add to desktop关闭
关闭